2011 Rapid Excavation and Tunneling Conference Proceedings
The limitations of the roadheader included: □ High operating cost associated
with high pick consumption rates and supplemental mechanical material when
very hard rock was encountered; □ Limited reach required an initial (partial)
mining ...
Steve Redmond, Victor Romero, 2011
2
Surface and Underground Excavations: Methods, Techniques and ...
Excavation with short advanced roof section using Roadheader (AMT70) Figure
10.1 1 Application of roadheader AMT 70 with NATM. are recommended. In
addition to the cutter boom attachment, the excavator is also equipped with a
loading ...
3
ENGINEERING IN ROCKS FOR SLOPES, FOUNDATIONS AND TUNNELS
But in mid-1990s, a tunnel by roadheader was excavated to carry a gas pipeline
and a sewage line at Anjar in Gujarat. Recently, one roadheader has been
brought to the rail-tunnelling site in Katra–Qazigund section in the state of Jammu
and ...
4
2009 Rapid Excavation and Tunneling Conference Proceedings
An AM50 roadheader was selected to excavate the softer portions of the tunnel.
Due to the potential for naturally occurring asbestos and silica dust, the
roadheader excavation crew wore half-face respirators and the heading was kept
damp by ...
Gary Almeraris, Bill Mariucci, 2009
5
Intelligent Robotics and Applications: First International ...
First International Conference, ICIRA 2008 Wuhan, China, October 15-17, 2008
Proceedings Caihua Xiong, Yongan Huang, Youlun Xiong. Modeling, Analysis
and Control for a Robotic Roadheader Junli Li, Yuanzong Li, and Zisheng Lian ...
Caihua Xiong, Yongan Huang, Youlun Xiong, 2008
6
Practical Tunnel Construction
Advantages of Roadheader Roadheaders offer certain advantages over TBMs
and drill blast methods. Unlike TBMs, roadheaders can mine any face
configuration. They can also be selective in the mining. For example, in mining
applications ...
7
Civil Excavations and Tunnelling: A Practical Guide
7.1. NATM. case. studies. 7.1.1 NATM at Frankfurt Metro A typical excavation
procedure, as shown in Fig. 7.4, was followed for the Frankfurt Metro Tunnel.1'16
7.1.2 NATM with roadheader In Table 7.1, Sandtner and Gehring12 outlined to ...
8
Shotcrete: More Engineering Developments: Proceedings of the ...
Many of the issues with regard to over- break by drill and blast means were
overcome by using the roadheader. The only issue encountered in this case, was
the slope of the drive and traction difficulties. Minor fractures have formed in a ...
Erik Stefan Bernard, 2004
9
Handbook of Tunnel Engineering I: Structures and Methods
Special construction processes can be used when the roadheader is operated in
combination with backup equipment like conveyor belts or suspension conveyors
. Also worth mentioning is the use of a “second working level” to simplify and ...
Bernhard Maidl, Markus Thewes, Ulrich Maidl, 2013
10
The Sand Compaction Pile Method
However, the excavation of Kiiciiksu tunnel with a shielded roadheader of 90 kW
of cutter power, showed that an instantaneous cutting rate of 5 m3/h is possible to
obtain in high strength rock formation having compressive strength values of ...
10 NEWS ITEMS WHICH INCLUDE THE TERM «ROADHEADER»
Find out what the national and international press are talking about and how the term
roadheader is used in the context of the following news items.
Mining machines, meet rock out during first year of LRT tunnel work
Late last week, Chewrocka, the roadheader machine that started digging at Queen and Kent streets, broke through rock to the tunnel carved out by Jawbreaker ... «Ottawa Sun, Nov 14»
Premier walks LRT tunnel under Ottawa
The group walked to the end of the excavation, 441 metres, to where the roadheader Jawbreaker had started carving out the cavern for Lyon station. It's there ... «Ottawa Sun, Aug 14»
Roadheaders claw away at downtown LRT tunnel, now roughly 30 …
The work is being done by three 135-tonne “roadheaders” named Jawbreaker, Chewrocka and Crocodile Rouge, which have been tasked with eating away at ... «Ottawa Citizen, Jul 14»
Under downtown streets: 19 new photos of LRT construction
West portal. Roadheader looking west - WP shows excavated material in loading device (part of the roadheader) "Construction of the Light Rail Transit tunnel ... «Ottawa Citizen, Jun 14»
Yeraltı dünyasının robotları
Bunun için 'Roadheader' adındaki galeri açma makineleri devreye giriyor. Madenin en derinine kadar inmeyi başarabilen bu araçtan sonra 'shearer' (kesici) ... «Radikal, May 14»
Massive sinkhole halts Ottawa LRT tunnelling
Around 10 p.m. Thursday a crew was excavating using the Crocodile Rouge roadheader machine when a worker noticed dirt was spilling down from above. «Ottawa Sun, Feb 14»
Road collapse leaves 8-metre wide sinkhole at tunnelling site
A digging crew in the tunnel first noticed dirt falling into the tunnel at about 10 p.m. ET Thursday, where the excavator — a roadheader called Crocodile Rouge ... «CBC.ca, Feb 14»
LRT tunnel a football field deep so far
The 135-tonne Roadheader machine, one of three named by Grade 4 students, started mining rock at the construction site in early November. The large west ... «Ottawa Sun, Jan 14»
WDS wins massive Eagle Downs coal contract
The drifts drivage will be completed using two 300kW roadheaders specifically engineering for the contract, as well as onboard roof-bolting and shotcrete tunnel ... «Australian Mining, Dec 13»
City of Ottawa launches contest to name LRT tunnelling machines
The Roadheader machines are each 135 tonnes and 20 metres long. The cutterhead has rock-ripping "pics" and about 50,000 pics will be needed to build the ... «Ottawa Sun, Oct 13»