Yantan Hydropower Station
Yantan Hydropower Station is located in the middle reaches of the Red River in the middle reaches of the Red River in the Dazhong Yao Autonomous County of Guangxi Zhuang Autonomous Region, 166 kilometers away from Longtan Hydropower Station and 83 kilometers downstream of Dahua Hydropower Station. It is the fifth grade hydropower station of the Red River, Guangxi is also the first installed capacity of over a million kilowatts of large hydropower stations. Is now ready for its expansion. The upper reaches of the hydropower station area of 106,600 square kilometers, the average annual flow of 1760 cubic meters / second, the annual average annual runoff of 55.5 billion cubic meters, the annual sediment load of 47.42 million tons. The total reservoir capacity of 3.35 billion cubic meters, the regulation capacity of 1.56 billion cubic meters, for the regulation of the reservoir. The total installed capacity of the power station is 1.21 million kilowatts, with an average annual power generation of 5.66 billion degrees. The project started in March 1985, shut down in November 1987, the first unit in September 1992 put into operation, in June 1995 4 units all put into operation. May 2000 Yantan Hydropower Station 250-ton shipwreck built navigation Yantan hydropower station to power generation, and the use of reservoir capacity drainage channel 153 km, also has irrigation, shipping, fishing, tourism and other comprehensive benefits. ...